Pensacola Harbor Navigation Channel Maintenance Dredging
DEPT OF DEFENSE · DEPT OF THE ARMY · W074 ENDIST MOBILE
- Response Deadline
- 2026-12-09 (17d left)
- Location
- MOBILE, AL Buying office: AL; work location not supplied
- Solicitation / Notice ID
- W9127827BA002 · NoticeId: 03ce83bdf29b48f59311fc30dea83bb8
- Primary Contact
- Jeffrey Donaldsonjeffrey.m.donaldson@usace.army.mil
Scope Summary (Sanitized Plain Text from SAM.gov)
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach.
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.