Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 1-2025. Specification No. OM25135
DEPT OF DEFENSE · DEPT OF THE ARMY · W07V ENDIST NEW ORLEANS
- Response Deadline
- 2027-05-28 (187d left)
- Location
- LA Work location: LA
- Solicitation / Notice ID
- W912P825BA006 · NoticeId: 687648f63706466f8805170715c6cb0f
- Primary Contact
- Cori A. CaimiCori.A.Caimi@usace.army.mil5048621352
Scope Summary (Sanitized Plain Text from SAM.gov)
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 1-2025. Specification No. OM25135 The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0 Above Head of Passes (AHP) on the Mississippi. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area located on the river bottom. The contract plates show the approximate location of the sill and configuration of the sill (should the sill need to be built to -30’ LWRP with a 620’ notch to -55’ LWRP) and borrow areas. Further details of the location, size, and configuration of the sill and borrow area required will be given in the dredging assignments. The magnitude of construction range for this Dredge project is between $10,000,000.00 and $25,000,000.00. This solicitation will be issued on or about 27 May 2025 and a bid opening date will be established in a future amendment. The solicitation documents for this procurement will be posted on Sam.gov. You can access these files from a link locate…
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.