MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
DEPT OF DEFENSE · DEPT OF THE AIR FORCE · FA8903 772 ESS PK
- Response Deadline
- 2027-01-15 (54d left)
- Location
- San Antonio, TX Work location: TX
- Solicitation / Notice ID
- FA8903-27-OT-001 · NoticeId: 75e5efdecd5e4638857b6e7828ade272
- Primary Contact
- 772 ESS/PKA772ESS.PKA.MACH1@us.af.mil
Scope Summary (Sanitized Plain Text from SAM.gov)
The scope of this AOI encompasses planning, design, engineering, alteration, repair, and physical construction for airfield pavement assets and associated systems. Incidental civil, electrical, mechanical, utility, environmental, and site work directly supporting the primary airfield infrastructure is authorized and included within this scope. All facility types, infrastructure systems, technical specialties, and testing capabilities identified throughout this document are expressly illustrative and non-exhaustive, including but not limited to: Horizontal airfield pavements and operating surfaces, including but not limited to runways, taxiways, aircraft parking aprons, arm/de-arm pads, compass swing bases, holding pads, alert pads, aircraft wash-rack pavements, access roadways, perimeter security paths, and all associated horizontal airfield pavements. Airfield visual and electrical systems, including but not limited to runway edge and centerline lighting, threshold and end lighting, taxiway guidance lighting, approach lighting systems, precision approach path indicators (PAPIs), airfield signage, electrical duct banks, vault infrastructure, counterpoise grounding grids, automated…
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.