Maintenance Dredging of New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project
DEPT OF DEFENSE · DEPT OF THE ARMY · W2SD ENDIST NEW YORK
- Response Deadline
- 2026-12-02 (10d left)
- Location
- NEW YORK, NY Buying office: NY; work location not supplied
- Solicitation / Notice ID
- W912DS27S0009 · NoticeId: 9f0b5e53c0004fb58b1b5d22a70352ff
- Primary Contact
- Orlando Nievesorlando.nieves@usace.army.mil
Scope Summary (Sanitized Plain Text from SAM.gov)
Market Survey Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York and New Jersey Harbor – Arthur Kill 50 foot Reach Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable over-depth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from the critical shoal area. The dredged material would be dredged and subsequently placed at a suitable, contractor provided, state permitted upland placement site(s). The dredged material is expected to consist primarily of silt, clay, and some sand. Based on the past dredging projects within the New York Harbor, and anticipated restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, tug-boats, sealed hull barges and survey vessels will be needed to perform the work during the dredging, transport, processing and placement activities. The dredging, transport and placement at a suitable, con…
Source extract: Sun, 22 Nov 2026 04:30:19 GMT. SAM.gov is the sole authoritative legal record. Verify amendments, Q&A, and mandatory site visits on SAM.gov.