Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three (3) years at the Anchorage Harbor with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in Cook Inlet Navigation Channel. The dredging must be accomplished in a manner that keeps the Port of Alaska dock face and terminals accessible for shipping traffic at all times. The Cook Inlet Navigation Channel, which is the marked entrance through Knik Arm Shoal to Anchorage Harbor, may also require periodic maintenance dredging. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.
Alaska Federal Heavy & Civil Engineering Construction Contracts
Deduplicated SAM.gov solicitations, 12-month USASpending award amounts, and contracts nearing expiration in Alaska. Free to browse with no account required.
Plus 0 early/market notices (Sources Sought, Presolicitation, Special Notice). 0 SB set-asides · 165 open nationwide.
No past 12-month awards logged yet for Alaska in this snapshot. View national benchmark.
Contracts ≥$25k nearing Period of Performance end date ($3.93M total value), with 4 in the 6–12m window. Not confirmed new solicitations.
Active Federal Heavy Civil Construction Notices in Alaska (2)
Deduplicated by Sol# · Out-of-state work excludedProject Title: Port of Nome Modification - Phase 2 Project Location: Nome, Alaska NAICS: 237990, Size Standard: $37,000,000 Full and Open Competition Invitation for Bid with Definitive Responsibility Criteria DPAS Rating: DO-C2, Refer to Clause FAR 52.211-15, Defense Priority and Allocation Requirements Description of Work: The Port of Nome Modification - Phase 2 project consists of unclassified dredging to establish a new deepwater basin and expand the existing outer basin at the Port of Nome. The base item includes dredging approximately 578,000 cubic yards of material at a design depth of -40 feet MLLW with a 2.0-foot allowable dredging tolerance (overdepth) establishing a maximum pay line of -42.0 feet MLLW. The option item includes dredging approximately 346,000 cubic yards to a design depth of -28 feet MLLW, with a 1.0-foot allowable dredging tolerance establishing a maximum pay line of -29.0 feet MLLW. Dredging will occur directly against the newly constructed Opencell sheet pile docks. All dredged material will be placed in a designated nearshore placement area. The contractor shall comply with commercial and industry standards as well as all applicable federal, state, and…
Get the free Alaska Heavy Civil Construction Monday digest.
One trade. One state. Delivered every Monday morning with deduplicated SAM.gov notices, past award context, and contracts nearing expiration. No account or credit card required.
Recent Past Awards
USASPENDING · >$0Expiring-Contract Watchlist
NEXT 12M · ≥$25KBased on USASpending Period of Performance Current End Dates. Expiration does not guarantee a new solicitation.
| Incumbent & Agency | Value | End Date |
|---|---|---|
DRENNON CONSTRUCTION & CONSULTING, INC. Department of the Interior · 140L6326P0009 | $538,500 | 2027-01-07 |
AMES 1, LLC Department of the Interior · 140L0626C0010 | $1.76M | 2027-07-29 |
NELCY CONSTRUCTION CORP Department of the Interior · 140FC326P0020 | $50,551 | 2027-08-31 |
TONGASS ENGINEERING, LLC Department of Agriculture · 1240BJ26P0004 | $504,820 | 2027-09-30 |
BRISTOL CONSTRUCTION SERVICES, LLC Department of Agriculture · 1240BJ26P0005 | $1.08M | 2027-10-31 |
Bidding basics for Alaska federal heavy civil construction
NAICS 237990 & Size Standard
SBA small-business ceiling: $45.0M. Typical Product Service Code: Y1 / Z2 (Civil Works, Drainage, Marine & Flood Control).
Wages & Compliance
Davis-Bacon Act prevailing wages and Miller Act surety bonding requirements commonly apply.
Methodology & Verification
Always verify attachments, amendments, and mandatory site walks directly on SAM.gov. Inspect data rules